Posts: n/a
Default Fixed Duration-strange calculation

I've inserted a new task that I wanted to have a duration of 3 week. I
changed the duration to fixed (which removed the ?) for 3w.

The default start date of the project is 1/3...the calculated end date ended
up being 1/12...no where near 3 weeks.

I have tried every task type FD,FU,FW with effort driven box both checked
and uchecked. I've tried assigning various values for estimated work. I have
tried setting the duration to 15d.

I just can't make it work. Help!
--
TraceyH
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do I use a check box to accept a calculation Joejoethecrackman Excel Discussion (Misc queries) 5 March 22nd 05 09:47 PM
How do I display leading zeros so I can export a fixed in Excel? World Referee and accountant Excel Discussion (Misc queries) 2 January 3rd 05 05:18 PM
Auto Calculation Automatically Turns Off???? Jeff K. Excel Discussion (Misc queries) 2 December 15th 04 02:39 AM


All times are GMT +1. The time now is 01:55 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"